What we install across San Diego County

Six services. One prep standard.

From residential garages in La Jolla to industrial floors in Chula Vista, every project gets diamond-grind prep and polyaspartic-grade materials. Trained by the owner. Quoted in one fixed number.

Owner-led training since 2008Polyaspartic-grade systems1-day installLifetime workmanship warranty
Pick your project

The six surfaces we coat.

Garage Floor Epoxy

Residential garage coatings done in one workday. Diamond-grind prep, polyaspartic finish, lifetime workmanship warranty. The most-requested service in our San Diego book.

Explore garage

Commercial & Industrial

Heavy-duty floor systems for warehouses, restaurants, retail, automotive, manufacturing. Spec sheets, COIs, and warranties on file. Built to take a beating.

Explore commercial

Decorative & Metallic

Designer metallics, flake systems, custom color matches. For homes and showrooms that want a finish you actually want to show off.

Explore decorative

Patios & Pool Decks

UV-stable, slip-resistant coatings for outdoor concrete. Cool to the touch, built for San Diego sun. Lifetime warranty across all coastal climates.

Explore outdoor

Basement & Interior

Seamless, moisture-tolerant epoxy floors for basements, laundry rooms, mudrooms, and finished interiors. Pet-safe, easy-clean, low-VOC.

Explore interior

Polyaspartic Coatings

The material we install on every job, explained. Why polyaspartic beats epoxy. Why our 5-layer system lasts 20+ years.

Read the spec
Why everything we install is polyaspartic-grade

Material chemistry isn’t a marketing detail.

The single biggest difference between a floor that lasts 3 years and a floor that lasts 20 is the chemistry of what’s actually on the slab.

Most concrete coatings sold today are epoxy. Cheaper to make, faster to apply, fine when nothing’s stressing it. Park a hot tire on it, leak some brake fluid, hit it with summer UV for a season, and it starts to fail.

What we install is polyaspartic – the next-generation coating chemistry. It cures faster (one day vs three), stays flexible (handles slab movement), holds up to UV (won’t yellow in San Diego sun), and resists the chemicals that destroy unprotected concrete (oil, brake fluid, solvents, deicer salt).

The cost difference per square foot is real. The lifespan difference is bigger. We’ve never installed anything else.

Read the full material spec

Our processThe Hank Dugan Standard™

Four steps. Every floor.

The playbook Hank trains every installer on – same prep, same materials, same warranty.

1

Walkthrough

Free, on-site, with you. Measure the slab. Check for cracks, oil, prior coatings. Talk color and finish.

2

Fixed quote

One number, in writing, within 24 hours. What we quote is what you pay. No mid-project surprises.

3

Diamond-grind prep

Slab ground to bare concrete. Cracks repaired. Primer applied. The prep is half the install day.

4

1-day install

Base coat, flake broadcast, topcoat. All in one workday. Walk on it the next morning.

Where we work

All of San Diego County.

Coast to inland. Owner-trained crews, owner-set prep standard, every job.

Get a free, fixed quote in 24 hours.

Free walkthrough. One number. The Hank Dugan Standard on every install.