Commercial & industrial coatings – San Diego County

Floors that take a beating. Built for the spaces that earn money.

Warehouses, restaurants, retail, automotive, manufacturing. Polyaspartic-grade systems spec’d to your traffic load, chemical exposure, and slip requirements. COIs on file. Warranties in writing.

Spec sheets & COIs on filePhased install for live spaces1-day cureLifetime workmanship warranty

Free site walkthrough.

Tell us about the facility. We’ll coordinate the walk and a fixed quote in 24-48 hours.

No obligation. Reply within 2 hours.

What we install in commercial spaces

The floor is part of the operation.

Commercial floors don’t fail like residential floors. They fail because of forklift wheels, hot grease, brake fluid, deicer salt off truck tires, chemical drips, daily mopping with industrial cleaners, and concentrated foot traffic in the same lanes for years.

What works in a garage doesn’t survive a warehouse. The chemistry has to be tougher, the prep has to be deeper, the broadcast has to add real slip resistance, and the topcoat needs to be measured in mils that exceed residential specs.

Spaces we coat across San Diego County:

  • Warehouses and distribution centers (forklift traffic, rack zones)
  • Restaurant kitchens, walk-in coolers, prep areas (NSF requirements)
  • Retail showrooms and entryways (high foot traffic, aesthetics)
  • Auto service bays, detail shops, dealership service drives
  • Manufacturing floors, machine pads, assembly lanes
  • Veterinary and animal care (chemical wash-down, slip resistance)
  • Light industrial and storage facilities

Every install includes spec sheets, MSDS, a written warranty, and a Certificate of Insurance in your name before the crew steps onto your slab.

System options

Three commercial spec tiers.

We spec the system to your operation – not a one-size-fits-all sticker.

Our commercial install playbookThe Hank Dugan Standard™

Phased, scheduled, and contained.

Live spaces stay operational. We work around your hours.

1

Site walkthrough

We meet on-site. Measure, spec, identify access constraints, plan around your operations.

2

Scoped quote

Fixed price, in writing, with system spec sheet, schedule, COI, and warranty terms. 24-48 hours.

3

Phased prep

Diamond-grind in sections. Containment for live spaces. Off-hours work where required.

4

Install & sign-off

Polyaspartic system applied per spec. Walk-through with you. Documentation handed over.

★★★★★

‘We hired them for our restaurant kitchen floor. Heavy traffic, hot grease, daily mopping with caustic cleaner – and a year later it still looks brand new. The prep work alone was on a different level from the three other quotes we got.’

SP
Sebastian P.
Google · North Park kitchen
★★★★★

‘Coated 8,000 sq ft of warehouse over two weekends so we never lost a shipping day. They worked around our forklift traffic, contained the dust, and the COI was in our compliance folder before week one. Floor still looks new at year three.’

MR
Marcus R.
Google · Otay Mesa distribution
★★★★★

‘Auto service bay – we’d had two prior epoxy floors fail under hot tire pickup. Hank’s crew diamond-ground everything off, laid the polyaspartic system, and we’ve gone two summers without a single lift or peel. Worth every penny.’

JL
Jeff L.
Google · Kearny Mesa auto shop
Service area

San Diego County, every facility type.

Commercial FAQs

What facilities managers ask first.

Yes. Most commercial installs phase the work into sections so part of the facility stays operational. We schedule off-hours, overnight, or weekend work as needed. We’ve installed in active warehouses, restaurants between shifts, and 24/7 facilities without shutting down operations.
Every commercial install includes a Certificate of Insurance in your name, product spec sheets, MSDS, written warranty, and any documentation your insurer or property management requires. We deliver these before the first crew arrives.
For restaurant kitchens, food prep, and similar regulated spaces we install NSF-listed coatings with seamless cove (coating that runs up the wall 4-6 inches to eliminate a dirt-trapping floor/wall joint), sloped drainage, and antimicrobial topcoat options. We’ve passed plenty of health inspections.
Lifetime workmanship warranty on every install. If the coating delaminates, peels, or bond-fails from our prep or application, we come back and re-install at no charge. Manufacturer material warranties layer on top for product-specific defects.
Typically 2-4 weeks from quote acceptance for standard commercial work. Faster for urgent deadlines (new lease, opening, inspection) when scheduling allows. Walkthroughs we usually schedule within the same week.

Quote your facility floor in 24-48 hours.

Free site walkthrough. Spec sheet, COI, and written warranty before the first crew arrives.